Get Insights / Inventory
Raw Materials
Protect the next production commitments with usable stock, lot traceability and shortage evidence.
Simulation data
Usable quantity after reservation versus released demand
Quantity + due dateSupplier and dye lot stay distinct through issue
Lot / batch requiredInspection and certificate decide whether stock is usable
QA + certificatePhysical stock is never treated as free stock automatically
Order reservationInventory state
Usable quantity is separated from reserved, in-transit and held stock.
Available12.8 t58%
Reserved6.4 t29%
Quality hold0.6 t3%
Inbound2.2 t10%
Action queue
Ranked by delivery impact and verified constraint.
Elastane coverage falls below requirement420 kg available vs 610 kg required for SB-1051Next · Confirm PO-2218 arrival or revise sequence
Polyester lot is blocked by qualityLOT-PES-240821 · tensile test pendingNext · Complete inspection before issue
Two yarn lots exceed target ageOldest receipt is 47 daysNext · Prioritize eligible FIFO consumption
Raw Materials records
Lot-level traceability · click a row for decision context and evidence.
| Record | Item / lot | Usable / on hand | Location | Status | Linked order | Coverage | Data trust | |
|---|---|---|---|---|---|---|---|---|
| RM-EL-040 | Elastane yarn · 40DLOT-EL-240818 | 420 / 510 kg | Warehouse · R02-B04 | Shortage risk | SB-1051 | 2.1 days | Simulation | |
| RM-PES-150 | Polyester yarn · 150DLOT-PES-240821 | 0 / 640 kg | Warehouse · QH-01 | Quality hold | SB-1048 | Blocked | Simulation | |
| RM-PES-75 | Polyester yarn · 75DLOT-PES-240731 | 3,260 / 4,110 kg | Warehouse · R01-A02 | Available | SB-1042 · SB-1045 | 14.8 days | Simulation | |
| RM-YRN-220 | Warp yarn · naturalLOT-WY-240809 | 2,480 / 3,100 kg | Warehouse · R04-C01 | Reserved | SB-1046 | 9.6 days | Simulation | |
| RM-PKG-90 | Packaging film · 90 μmLOT-PF-240812 | 1,860 / 2,040 kg | Warehouse · R06-A03 | Available | Multiple | 21.3 days | Simulation | |
| RM-OIL-32 | Knitting lubricant · ISO 32LOT-KL-240706 | 380 / 460 L | Chemical store · C02 | Age watch | Indirect | 18.0 days | Simulation |
Prototype data boundary
Quantities, coverage, allocation and risk values are simulation only. Production use requires ERP/WMS, quality, order, location and lot-event validation.